Sheffield Central site progressions: June 2019

During May and June, the progression at Sheffield Central has been remarkable. During the past two months, there has been a number of tasks ticked off the construction list, including:


• Waterproofing the basement walls

• Constructing the basement walls

• Casting the basement walls

• Waterproofing the ground floor slabs

• Constructing the ground floor slabs

• Casting the ground floor slabs

• Installing the temporary props


In the coming weeks, plans for construction include:


• Completion of the basement wall construction

• Construction of the basement slab

• Completion of the installation of temporary props

• Construction of basement ramp

• Installation of steel structure frame

• Pouring of concrete to immediate floors

• Installation of concrete staircases

• Installation of roof coverings

• Installation of light weight steel perimeter walls

• Installation of windows and external doors


Take a look at our construction gallery below to see what's been happening on site:

View the Sheffield Central development here.

Our office hours:

Monday to Friday,

8.00am - 5.00pm

Call:

+44 (0)161 302 6732

Find us:

4th Floor, 2 Mount Street, Manchester, M2 5WQ

© Global Edge Ltd, 

Company No. 10739645

 

Privacy Policy

Website design by Global Edge